Office, laboratory - interior construction

It is projector setting construction example 01

Construction data:
Place Meeting room of the office
Period 1st
Construction contents Projector setting, screen installation, wiring, picture adjustment
Reference price osodan
 
I carried it out in the meeting room of the office. I carried it out until projector setting, screen installation, wiring, picture adjustment and constructed it in a day for the term of works. Including term of works, please feel free to contact us about the details of the construction.
 

It is partition setting construction example 02

Construction data:
Place Meeting room of the office
Period 1st
Construction contents Ceiling screw stopping anchor fixation, glass installation
Reference price osodan
 
I carried it out in the meeting room of the office. I carried it out until ceiling screw stopping anchor fixation, glass installation and constructed it in a day for the term of works. Including term of works, please feel free to contact us about the details of the construction.
 

It is the removal work of the steel door example 03

Construction data:
Place Laboratory
Period 1st
Construction contents Removal of the door, the removal of the existing faucet, collection of the removal door
Reference price osodan
 
I carried it out in a laboratory. I carried it out until the removal of the door, the removal of the existing faucet, the collection of the removal door and constructed it in a day for the term of works. Including term of works, please feel free to contact us about the details of the construction.
 

It is darkroom repair example 04

Construction data:
Place Darkroom
Period 3rd
Construction contents Existing sink, shelf removal, the wall painting, tile carpet construction
Reference price osodan
 
I carried it out in a darkroom. I carried it out until existing sink, shelf removal, the wall painting, tile carpet construction and constructed it in three days for the term of works. Including term of works, please feel free to contact us about the details of the construction.
 

It is laboratory repair example 05

Construction data:
Place Laboratory
Period 3rd
Construction contents I finish it with existing shelf removal, blackboard removal, mortar repair, new shelf setting, the wall painting
Reference price osodan
 
I carried it out in a laboratory. I carried it out until existing shelf removal, blackboard removal, mortar repair, new shelf setting, wall painting finish and constructed it on 3rd for the term of works. Including term of works, please feel free to contact us about the details of the construction.
 

It is laboratory soundproofing construction example 06

Construction data:
Place Laboratory
Period 3rd
Construction contents I put good self-care, footing setting, stud bolt assembling, sound absorption material and board pasting up, a cross, and good self-care removal cleans
Reference price osodan
 
I carried it out in a laboratory. I put good self-care, footing setting, stud bolt assembling, sound absorption material and board pasting up, a cross and carried it out until good self-care removal cleaning and constructed it on 3rd for the term of works. Including term of works, please feel free to contact us about the details of the construction.
 

It is a clean booth example 07

Construction data:
Place Laboratory
Period 2nd
Construction contents I build good self-care, a filter and build a frame and make a trial
Reference price osodan
 
I carried it out in a laboratory. I built good self-care, a filter and built a frame and carried it out until a trial run and constructed it on 2nd for the term of works. Including term of works, please feel free to contact us about the details of the construction.
 

It is window shade construction example 08

Construction data:
Place Office
Period 1st
Construction contents Actual survey, window shade installation
Reference price osodan
 
I carried it out in an office. I carried it out until actual survey, window shade installation and constructed it in a day for the term of works. Including term of works, please feel free to contact us about the details of the construction.
 

Flows from an inquiry to delivery

Koshin shoko Co., Ltd
〒181-0002
2-13-9, Mure, Mitaka-shi, Tokyo
TEL. 0422-46-6434
FAX. 0422-46-6313
General trading company handling industrial instrument
Back to TOP