Move to the text

Office, laboratory - water supply, faucet construction

It is faucet construction example 01

Construction data:
Place Office
Period 1st
Construction contents Existing sink removal, new sink setting, plumbing
Reference price osodan
 
I carried it out in an office. I carried it out until existing sink removal, new sink setting, plumbing and constructed it in a day for the term of works. Including term of works, please feel free to contact us about the details of the construction.
 

It is water supply faucet construction example 02

Construction data:
Place Laboratory
Period 1st
Construction contents Setting of the removal of the existing faucet, a new faucet and the hose mouth
Reference price osodan
 
I carried it out in a laboratory. I carried it out until the setting of the removal of the existing faucet, a new faucet and the hose mouth and constructed it in a day for the term of works. Including term of works, please feel free to contact us about the details of the construction.
 

It is sink repair example 03

Construction data:
Place Office
Period 1st
Construction contents Existing sink removal, new sink setting, plumbing
Reference price osodan
 
I carried it out in an office. I carried it out until existing sink removal, new sink setting, plumbing and constructed it in a day for the term of works. Including term of works, please feel free to contact us about the details of the construction.
 

Flows from an inquiry to delivery

Koshin shoko Co., Ltd
〒181-0002
2-13-9, Mure, Mitaka-shi, Tokyo
TEL. 0422-46-6434
FAX. 0422-46-6313
General trading company handling industrial instrument
Back to TOP