Office, laboratory - apparatus installation, exchange, removal construction

It is the electricity room wind pressure type shutter exchange work example 01

Construction data:
Place Laboratory in the factory
Period 1st
Construction contents The ready-made article stocking, exchange work, trial run confirmation
Reference price osodan
 
I carried it out in the laboratory in the factory. I carried it out until the ready-made article stocking, exchange work, trial run confirmation and constructed it in a day for the term of works. Including term of works, please feel free to contact us about the details of the construction
 

It is doorknob one model numeric keypad installation example 02

Construction data:
Place Office
Period 1st
Construction contents Existing doorknob removal, one new doorknob type numeric keypad installation
Reference price osodan
 
I carried it out in an office. I carried it out until existing doorknob removal, one new doorknob type numeric keypad installation and constructed it in a day for the term of works. Including term of works, please feel free to contact us about the details of the construction.
 

It is key distribution work example 03

Construction data:
Place Laboratory
Period 1st
Construction contents Existing doorknob removal, new doorknob installation, door closer installation, existing blackout curtain, new blackout curtain installation
Reference price osodan
 
I carried it out in a laboratory. I carried it out until existing doorknob removal, new doorknob installation, door closer installation, an existing blackout curtain, new blackout curtain installation and constructed it in a day for the term of works. Including term of works, please feel free to contact us about the details of the construction.
 

It is air-conditioner installation example 04

Construction data:
Place Office
Period 1st
Construction contents The air-conditioner stocking, installation, outdoor unit installation, wiring, trial run
Reference price osodan
 
I carried it out in an office. I carried it out until the air-conditioner stocking, installation, outdoor unit installation, wiring, a trial run and constructed it in a day for the term of works. Including term of works, please feel free to contact us about the details of the construction.
 

It is angle assembling, air-conditioner installation example 05

Construction data:
Place Laboratory
Period 2nd
Construction contents Field measurement, angle field processing, imposition, back shelf board installation, air-conditioner new installation
Reference price osodan
 
I carried it out in a laboratory. I installed field measurement, angle field processing and carried it out until back shelf board installation, air-conditioner new installation and constructed it on 2nd for the term of works. Including term of works, please feel free to contact us about the details of the construction.
 

Flows from an inquiry to delivery

Koshin shoko Co., Ltd
〒181-0002
2-13-9, Mure, Mitaka-shi, Tokyo
TEL. 0422-46-6434
FAX. 0422-46-6313
General trading company handling industrial instrument
Back to TOP