Construction data:
Place Factory
Period 3rd
Construction contents I clean and polish it and finish it with a coat of crack repair, undercoating
Reference price osodan
 
I carried it out in a factory. I cleaned and polished it and carried it out until crack repair, undercoating, a final coating and constructed it in three days for the term of works. Including term of works, please feel free to contact us about the details of the construction.
 

It is the painting work of the experiment alcove of a tea arbor example 02

Construction data:
Place Factory
Period 2nd
Construction contents I clean and polish it and finish it with a coat of crack repair, undercoating
Reference price osodan
 
I carried it out in a factory. I cleaned and polished it and carried it out until crack repair, undercoating, a final coating and constructed it in two days for the term of works. Including term of works, please feel free to contact us about the details of the construction.
 

It is movement of the laboratory equipment and the earthquake proofing fixation work such as shelves example 03

Construction data:
Place Factory, office
Period 1st
Construction contents Removal of the anchor bolt, shelf fixation, machine parts transportation,
Reference price osodan
 
I carried it out in a factory, an office. I carried it out until the removal of the anchor bolt, shelf fixation, machine parts transportation and constructed it in a day for the term of works. Including term of works, please feel free to contact us about the details of the construction.
 

It is insulation construction example 04

Construction data:
Place Factory
Period 2nd
Construction contents I put good self-care, footing setting, stud bolt assembling, an insulation material and board pasting up, a cross, and good self-care removal cleans
Reference price osodan
 
I carried it out in a factory. I put good self-care, footing setting, stud bolt assembling, an insulation material and board pasting up, a cross and carried it out until good self-care removal cleaning and constructed it on 2nd for the term of works. Including term of works, please feel free to contact us about the details of the construction.
 

It is clean booth setting example 05

Construction data:
Place Factory
Period 1st
Construction contents Field work, machine parts import, clean booth assembling, clean degree confirmation
Reference price osodan
 
I carried it out in a factory. I carried it out until a field work, machine parts import, clean booth assembling, clean degree confirmation and constructed it in a day for the term of works. Including term of works, please feel free to contact us about the details of the construction.
 

Flows from an inquiry to delivery

Koshin shoko Co., Ltd
〒181-0002
2-13-9, Mure, Mitaka-shi, Tokyo
TEL. 0422-46-6434
FAX. 0422-46-6313
General trading company handling industrial instrument
Back to TOP