Move to the text

- repair, maintenance in the factory

It is the repair of the supplier example 01

Construction data:
Place Factory
Period 1st
Construction contents Deficient confirmation, identification, parts exchange, the plumbing welding, pump exchange, trial run confirmation
Reference price osodan
 
I carried it out in a factory. I carried it out until deficient confirmation, identification, parts exchange, the plumbing welding, pump exchange, trial run confirmation and constructed it in a day for the term of works. Including term of works, please feel free to contact us about the details of the construction.
 

It is compressor transference example 02

Construction data:
Place Factory
Period 1st
Construction contents The plumbing removal, existing compressor export, import, the plumbing work, electric wiring, trial run confirmation
Reference price osodan
 
I carried it out in a factory. I carried it out until the plumbing removal, existing compressor export, import, the plumbing work, electric wiring, trial run confirmation and constructed it in a day for the term of works. Including term of works, please feel free to contact us about the details of the construction.
 

It is cascade pump exchange example 03

Construction data:
Place Factory
Period 1st
Construction contents Cascade pump removal, new pump setting, trial run
Reference price osodan
 
I carried it out in a factory. I carried it out until cascade pump removal, new pump setting, trial run and constructed it in a day for the term of works. Including term of works, please feel free to contact us about the details of the construction.
 

It is cylinder packing exchange example 04

Construction data:
Place Factory
Period 1st
Construction contents Cylinder removal in the damper device, O ring removal in the cylinder, cleaning, new O ring imposition, installation, trial run in the damper device
Reference price osodan
 
I carried it out in a factory. I carried it out until the cylinder removal in the damper device, the O ring removal in the cylinder, cleaning, a new O ring imposition, installation, the trial run in the damper device and constructed it in a day for the term of works. Including term of works, please feel free to contact us about the details of the construction.
 

Flows from an inquiry to delivery

Koshin shoko Co., Ltd
〒181-0002
2-13-9, Mure, Mitaka-shi, Tokyo
TEL. 0422-46-6434
FAX. 0422-46-6313
General trading company handling industrial instrument
Back to TOP