Move to the text

Outdoor - plumbing

It is sprinkler timer control unit installation example 01

Construction data:
Place The factory circumference
Period 3rd
Construction contents Outdoor construction (the plumbing setting and ball valve setting), indoor construction (Control Box installation and electric wire connection), setting of the fixed metal fittings of the exit door, cut of the drainage pipe
Reference price osodan
 
I carried it out in the factory circumference. I carried it out to outdoor construction (the plumbing setting and ball valve setting), indoor construction (Control Box installation and electric wire connection), the setting of the fixed metal fittings of the exit door, the cut of the drainage pipe and constructed it in three days for the term of works. Including term of works, please feel free to contact us about the details of the construction.
 

Flows from an inquiry to delivery

Koshin shoko Co., Ltd
〒181-0002
2-13-9, Mure, Mitaka-shi, Tokyo
TEL. 0422-46-6434
FAX. 0422-46-6313
General trading company handling industrial instrument
Back to TOP