Move to the text

Outdoor - building, warehouse, tent construction

It is large door exchange construction example 01

Construction data:
Place The factory circumference
Period 2nd
Construction contents I hang crane truck setting, existing door removal, a new door and am crowded and paint new door installation, the outside ceiling, door frame keren work
Reference price osodan
 
I carried it out in the factory circumference. I hung crane truck setting, existing door removal, a new door and was crowded and carried it out until new door installation, the outside ceiling, door frame keren work, the painting and constructed it on 2nd for the term of works. Including term of works, please feel free to contact us about the details of the construction.
 

It is garbage depot repair example 02

Construction data:
Place Outdoor garbage place for research institute
Period 2nd
Construction contents Partition concrete block removal, intermediate part partition block setting, steel frame assembling, a periphery and roof tin plate setting, a net and takeoff mouth board setting
Reference price osodan
 
I carried it out in the outdoor garbage place for research institute. I carried it out until partition concrete block removal, intermediate part partition block setting, steel frame assembling, a periphery and roof tin plate setting, a net and takeoff mouth board setting and constructed it on 2nd for the term of works. Including term of works, please feel free to contact us about the details of the construction.
 

It is tent house repair example 03

Construction data:
Place The research institute outdoors
Period 2nd
Construction contents I repaper existing seat removal, a new seat
Reference price osodan
 
I carried it out the research institute outdoors. I carried it out until existing seat removal, new seat washing and stretching and constructed it in two days for the term of works. Including term of works, please feel free to contact us about the details of the construction.
 

It is perron handrail repair example 04

Construction data:
Place The factory circumference
Period 1st
Construction contents Handrail stairs actual survey, seat production, installation
Reference price osodan
 
I carried it out in the factory circumference. I carried it out until handrail stairs actual survey, seat production, installation and constructed it in a day for the term of works. Including term of works, please feel free to contact us about the details of the construction.
 

Flows from an inquiry to delivery

Koshin shoko Co., Ltd
〒181-0002
2-13-9, Mure, Mitaka-shi, Tokyo
TEL. 0422-46-6434
FAX. 0422-46-6313
General trading company handling industrial instrument
Back to TOP